Inventory, orders and accounting that agree with each other

When stock counts, open orders and the books live in separate places, someone spends their week reconciling them. We connect them into one system, starting with the ERP you already have if it is worth keeping.

You probably need this if…

  • the inventory number in the system and the count on the shelf rarely match.
  • orders are entered once for the warehouse and again for accounting.
  • purchasing decisions are made from a spreadsheet someone updates by hand.
  • you paid for an ERP that half the company works around instead of in.
  • you only find out what a job or product line actually cost after the books close.

What we build for ERP systems.

Fitted to how you already work, and connected to the systems around it.

  • ERP rescue and cleanup

    For a system that was set up badly or has drifted, we sort out the configuration, clean the data, and get people working in it again.

  • Inventory and warehouse control

    Stock levels, locations, transfers and counts tracked as they happen, with barcode scanning where it saves time.

  • Purchasing and reordering

    Reorder points, purchase orders and receiving tied to real stock and demand, instead of a weekly guess.

  • Order to invoice flow

    Orders move from entry to picking, shipping and invoicing in one path, with no step retyped along the way.

  • Production and job costing

    Materials, labor and overhead tracked against each job or production run, so you see margins while the work is still going.

  • Custom modules and integrations

    Screens, workflows and connections for the parts of your business your ERP does not handle, built to fit alongside it.

Today, versus afterward.

What changes on an ordinary Tuesday once this is in place.

  • Checking what is in stock

    Today: Look it up, then walk out to the shelf to be sure

    Afterward: The system count is the one people trust

  • Entering a customer order

    Today: Typed once for the warehouse and again for billing

    Afterward: Entered once and carried through to the invoice

  • Deciding what to reorder

    Today: A spreadsheet, a hunch and a walk through the warehouse

    Afterward: A suggested order based on stock and recent demand

  • Knowing what a job really cost

    Today: Pieced together after the month closes

    Afterward: Visible on the job while it is still running

The same four steps, applied to ERP systems.

The order does not change. What each step looks like does.

  1. 01Audit

    We find where the hours go

    We follow an order from the moment it arrives to the moment it is paid, and a part from the purchase order to the shelf, and note every gap and duplicate entry.

  2. 02Integrate

    We connect what you already own

    If your ERP or accounting system is sound, we keep it and connect your storefront, shipping, CRM and scanners to it first.

  3. 03Build

    We build only what is missing

    We add custom modules only for the parts of your operation the ERP cannot handle, or recommend a new system when the current one truly cannot be saved.

  4. 04Run

    We train, measure and hand over

    We move and clean the data, train each department on its own part of the system, and track whether the counts and costs start to hold up.

Straight answers.

Do we need to replace our ERP?

Often not. Many struggling ERP systems are set up poorly rather than wrong for the business. The audit tells us whether fixing and extending yours is the better path, and replacing it is a last resort.

We are a small business. Is an ERP overkill?

It can be. If your accounting software plus a few connections covers inventory and orders, that is the answer we will give you. An ERP earns its keep when several departments touch the same orders and stock.

How do you handle moving our data?

Carefully and in stages. We clean up item lists, customers and open orders before they move, check the results against your current records, and run both side by side when the risk calls for it.

Can you work with the ERP we already have?

Yes. Much of this work is integrating or extending an existing system rather than starting over. We look at what yours can connect to and build around it.

Find out if it is worth it.

The audit puts a number on it: the hours this work costs you today, and what it should cost. In writing, and free.

Work requested
Operations audit
Findings
In writing
Charge
$0.00
Request the audit